Lag During Boot Up Due To Power Characterization Check - Cisco expressway ce1100 Installation Manual

Table of Contents

Advertisement

Cisco Expressway CE1100 Appliance Installation Guide
Troubleshooting

Lag During Boot up Due to Power Characterization Check

The power characterization test is run only once when you plug in and power up the CE1100. If the power
characterization test continues to run, causing a lag in the boot time, ensure that it is disabled in the CIMC. To do so:
1.
Log in to the CIMC (see
2.
Go to Server > Power Policies > Power Cap Configurations.
3.
Ensure that the Power Characterization at Boot check box is unchecked.
4.
Click Save Changes.
Connect Using the CIMC Port, page
18
12).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents