Navien NR-180 Installation Manual page 41

Hide thumbs Also See for NR-180:
Table of Contents

Advertisement

Navien Gas Water Heater Installation
3.Case III NR, NP + NR-A, NP-A Model Recirculation
Slave n-15
Slave n-14
Hot
Cold
Gas
Hot
Cold
Gas
"B"
"B"
DHW Supply
It is necessary to install the check valve in "C".
Install check valve in either "A" or "C"
4. Case IV. CH + NR-A, NP-A Model Recirculation
Master
(NR-10PU)
(CH Model)
Space Heating
WATER
PRESSURE
psi
H.S
H.R
Primary Loop
Secondary Loop
Install check valve in the "A" series cold water inlet for cascade system.
When linking with CH series connnect the solenoid valve wire to the external
power wire of CH series.
Slave n-1
Master Unit
Communication Cable
Hot
Rec
Cold
Gas
Hot
Rec
"C"
Recirculation
.
Slave n-1
NR/NP-(A)
Communication
Cable
Hot
Rec
Cold
Gas
Hot
Hot Cold Gas
DHW SUPPLY
Remote Controller
(NR-10DU)
SYMBOL
Union
Ball Valve
Cold
Gas
Check Valve
"C"
Faucet
Expansion Tank
Pressure Relief Valve
Gas Supply
"A"
Cold Water Supply
SYMBOL
Slave n-15
Faucet
NR/NP-(A)
Expansion Tank
Pressure Relief Valve
Rec
Cold
Gas
Circulation Pump
Union
BALL VALVE
CHECK VALVE
S
Solenoid Valve
Air Seperator
GAS SUPPLY
COLD WATER SUPPLY
RECIRCULATION
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents