Cisco Catalyst 3110G Getting Started Manual page 8

For ibm bladecenter
Hide thumbs Also See for Catalyst 3110G:
Table of Contents

Advertisement

• For switch stacks, you should first install and configure the switch module that will be the stack
master before installing any additional switch modules. See the "Creating Switch Stacks" section
on page 21 for more information.
• Review and become familiar with the safety guidelines in the Regulatory Compliance and Safety
Information for the Cisco Catalyst Switch Module 3110G, 3110X, and 3012 for IBM BladeCenter
on the documentation CD.
• Review and become familiar with the safety guidelines, and the temperature, power, and
grounding requirements specified in the IBM blade enclosure installation and user's guide.
Installing the Switch Module
Warning
Before working on equipment that is connected to power lines, remove jewelry
(including rings, necklaces, and watches). Metal objects will heat up when connected
to power and ground and can cause serious burns or weld the metal object to the
terminals. Statement 43
Warning
Do not work on the system or connect or disconnect cables during periods of lightning
activity. Statement 1001
Warning
Class 1 laser product. Statement 1008
To prevent electrostatic-discharge (ESD) damage when installing switch modules, follow
Caution
your normal board and component handling procedures.
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 3110xCatalyst 3012

Table of Contents