Pipe Connection; Vacuum Sequence; Charging Sequence - LG GC-B207GLQV Service Manual

Sxs
Table of Contents

Advertisement

TROUBLE DIAGNOSIS
Items
4.Vacuum degassing.
5.Refrigerant charging.
Compressor
3

Pipe Connection

Connect a red hose to the high pressure side and a blue hose to the
low pressure side.

Vacuum Sequence

Open
,
valves and evacuate for 40 minutes. Close valve

Charging sequence

1) Check the amount of refrigerant supplied to each model after completing vacuum
degassing.
2) Evacuate bombe with a vacuum pump.
3) Measure the amount of refrigerant charged.
- Measure the weight of an evacuated bombe with an electronic scale.
- Charge refrigerant into a bombe and measure the weight. Calculate the weight of
refrigerant charged into the bombe by subtracting the weight of an evacuated bombe.
Indicate the weight of
an evacuated bombe
R134a
- 84 -
Precautions
Evaporator
Suction pipe
Drier
Condenser
Low
pressure
Blue
Vaccum
Pump
Calculation of amount of refrigerant charged
the amount of refrigerant charged= a weight after charging -
a weight before charging (a weight of an evacuated cylinder)
2
1
High
pressure
Yellow
Red
KEYPOINTING
- If power is applied
during vacuum
degassing, vacuum
degassing shall be
more effective.
- Operate compressor
while charging
refrigerant. (It is
easier and more
certain to do like
.
this.)
KEYPOINTING
- Be sure to charge
the refrigerant at
around 25°C.
- Be sure to keep -5g
in the winer and
+5g in summer

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gc-b197hwl

Table of Contents