9.2.2.
Upper base
1. Procedures 1,2 of "9.2.1. Disassembling of Traverse
Base Ass'y, Drive P.C.B. and SW P.C.B." is performed in
this section.
2.
is pushed with precision (-) screw driver and the Rail is
removed.
3. The precision (-) screw driver into
is pushed in the arrow direction while floating and then
remove it (as well as other side).
and Cartridge spring
50
4. The Clamp cover is removed.
5. The 3 hooks are removed and then Magnet, Back york
are removed.