Toshiba RAS-10JKVP-E Service Manual page 8

Hide thumbs Also See for RAS-10JKVP-E:
Table of Contents

Advertisement

4. Cord heater installation work procedure
No.
Photo / Explanatory diagram
Remove each cabinet, inverter assembly, motor base assembly, and partition board assembly.
1
* Do not damage the electric parts such as cables, connectors, etc. while this work.
1-1
1-2
1-3
1-4
Remove the upper cabinet and the valve cover.
Upper cabinet
Related parts / Screws list
Part name
Upper cabinet
Valve cover
Valve cover
Remove the front cabinet and the wiring cover.
Related parts / Screws list
Wiring cover
Part name
Front cabinet
Wiring cover
Front cabinet
Remove the back cabinet.
Related parts / Screws list
Back cabinet
Part name
Back cabinet
Remove the inverter assembly.
No. Part name
1 TE sensor
2 TD sensor
3 TO sensor
4 TS sensor
4-way valve
5
coil
6 PMV coil
7 Fan motor
Compressor
8
lead
9 Case thermo
Reactor
10
(2 pieces.)
Appendix-3
Procedure
Used screw
Screw type
Quantity
Ø4 × 10
Ø4 × 10
Used screw
Screw type
Quantity
Ø4 × 10
Ø4 × 10
Used screw
Screw type
Quantity
Ø4 × 10
Connector No.
Connector color
CN600
White
CN601
White
CN602
White
CN603
White
CN701
Yellow
CN703
White
CN300
White
CN301
White
White
(Intermediate connector)
CN500
White
(Intermediate connector)
White
Appendix
2
1
7
2
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ras-10javp-eRas-13jkvp-eRas-13javp-e

Table of Contents