Cisco ASR-920-12SZ-IM Hardware Installation Manual page 110

Aggregation services router
Hide thumbs Also See for ASR-920-12SZ-IM:
Table of Contents

Advertisement

Safely Powering Off the Router
SUMMARY STEPS
1. Slip on the ESD-preventive wrist strap included in the accessory kit.
2. Enter the reload command.
3. Confirm the reload command.
4. After confirming the reload command, wait until the system bootstrap message is displayed before powering
off the system:
5. Remove power cables, if any, from the Cisco ASR 920-24SZ-IM, ASR-920-24SZ-M, ASR-920-24TZ-M
Router:
DETAILED STEPS
Step 1
Slip on the ESD-preventive wrist strap included in the accessory kit.
Step 2
Enter the reload command.
Step 3
Confirm the reload command.
Example:
Rmcp-6ru-1#reload
Proceed with reload? [confirm]
Aug 17 00:06:47.051 R0/0: %PMAN-5-EXITACTION: Process manager is exiting: prs exit with reload chassis
code
Step 4
After confirming the reload command, wait until the system bootstrap message is displayed before powering off the
system:
Example:
System Bootstrap, Version 15.4(3)S1, RELEASE SOFTWARE (fc1)
Technical Support: http://www.cisco.com/techsupport
Copyright (c) 2012 by cisco Systems, Inc.
Current image running: Boot ROM0
Last reset cause: RSP-Board
UEA platform with 2097152 Kbytes of main memory
Step 5
Remove power cables, if any, from the Cisco ASR 920-24SZ-IM, ASR-920-24SZ-M, ASR-920-24TZ-M Router:
• For power supplies with a circuit breaker switch, position the switch to the Off (O) position.
• For power supplies with a standby switch, place the standby switch in the Standby position.
After powering off the router, wait for a minimum of 30 seconds before powering it on again.
Note
Cisco ASR-920-12SZ-IM Aggregation Services Router Hardware Installation Guide
98
Initial Configuration

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents