Power Up The Appliance - Cisco C690 Quick Start Manual

Email security appliance
Table of Contents

Advertisement

Item
Port
7
Data 5
8
Management
interface
9

Power Up the Appliance

Power up the appliance by pressing the On/Off switch on the
front panel of the Cisco C690. You must wait 10 minutes for the
system to initialize each time you power up the system. After the
machine powers up, solid green lights on the front of the
appliance indicate that the appliance is operational. The
network activity light will be green but may not be solid. .
If turned on quickly after connecting power to the
Note
appliance, the appliance powers up, the fans spin and
the LEDs turn on. Within 30-60 seconds, the fans stop
and all LEDs turn off. The appliance powers on 31
seconds later. This behavior is by design to allow the
system firmware and controller to synchronize. 
Wait at least 10 minutes for the system to complete the
power up sequence and the LEDs to turn green. If you
turn the power off before the initialization is complete,
the appliance will NOT reach an operational state and
must be returned to Cisco.
Description
A Gigabit Ethernet customer data
interface.
A Gigabit Ethernet interface that is
restricted to management use only.
9

Advertisement

Table of Contents
loading

Table of Contents