5.0 Piping
5.1 Piping General Arrangement
Figure 5-1 Piping general arrangement, downflow, CW026 – CW114
Chilled
Water
Return
Chilled
Water
Supply
Shut*
Off
Valves
Hose*
Bibs
Chilled
Water
Return
Chilled
Water
Supply
Shut*
Off
Valves
Hose*
Bibs
A
B
Ball
Valve
(Optional)
Flow
Switch
3-WAY VALVE
(Optional)
Valve
Actuator
Ball
Valve
(Optional)
2-WAY VALVE
Valve
Actuator
AB
3-Way
Chilled
Water
Valve
Bleed
Valve
2-Way
Chilled
Water
Valve
*Components are not supplied by Liebert but
are required for proper circuit operation
and maintenance.
53
Liebert
Piping General Arrangement
Air Flow
Bleed
Valve
Chilled
Water
Coil
Air Flow
Chilled
Water
Coil
FACTORY PIPING
FIELD PIPING
DPN001657
Pg. 1 Rev. 3
®
™
CW
System Design Manual