Joint Cementing Procedure; Venting Practices - Lennox EL296DFV Installation Instructions Manual

Elite series gas furnace downflow air discharge
Hide thumbs Also See for EL296DFV:
Table of Contents

Advertisement

Joint Cementing Procedure

All cementing of joints should be done according to the
specifications outlined in ASTM D 2855.
NOTE - A sheet metal screw may be used to secure
the intake pipe to the connector, if desired. Use a drill
or self tapping screw to make a pilot hole.
DANGER
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system
check. Allow fumes to dissipate for at least 5 minutes
before placing unit into operation.
1 - Measure and cut vent pipe to desired length.
2 - Debur and chamfer end of pipe, removing any ridges
or rough edges. If end is not chamfered, edge of pipe
may remove cement from fitting socket and result in a
leaking joint.
NOTE - Check the inside of vent pipe thoroughly for
any obstruction that may alter furnace operation.
3 - Clean and dry surfaces to be joined.
4 - Test fit joint and mark depth of fitting on outside of pipe.
5 - Uniformly apply a liberal coat of PVC primer for PVC or
use a clean dry cloth for ABS to clean inside socket
surface of fitting and male end of pipe to depth of fitting
socket.
6 - Promptly apply solvent cement to end of pipe and in­
side socket surface of fitting. Cement should be ap­
plied lightly but uniformly to inside of socket. Take
care to keep excess cement out of socket. Apply sec­
ond coat to end of pipe.
NOTE - Time is critical at this stage. Do not allow prim­
er to dry before applying cement.
7 - Immediately after applying last coat of cement to pipe,
and while both inside socket surface and end of pipe
are wet with cement, forcefully insert end of pipe into
socket until it bottoms out. Turn PVC pipe 1/4 turn dur­
ing assembly (but not after pipe is fully inserted) to dis­
tribute cement evenly. DO NOT turn ABS or cellular
core pipe.
NOTE - Assembly should be completed within 20 sec­
onds after last application of cement. Hammer blows
should not be used when inserting pipe.
8 - After assembly, wipe excess cement from pipe at end
of fitting socket. A properly made joint will show a
bead around its entire perimeter. Any gaps may indi­
cate an improper assembly due to insufficient sol­
vent.
9 - Handle joints carefully until completely set.

Venting Practices

Piping Suspension Guidelines
SCHEDULE 40
all other pipe* - 3'
* See table 4 for allowable pipe.
NOTE - Isolate piping at the point where it exits the outside wall or
roof in order to prevent transmission of vibration to the structure.
Wall Thickness Guidelines
inside
CHIMNEY
OR GAS
VENT
(Check sizing
for water
heater only)
FURNACE
(Replaced
by EL193)
If an EL296DFV furnace replaces a furnace which was
commonly vented with another gas appliance, the size of
the existing vent pipe for that gas appliance must be
checked. Without the heat of the original furnace flue prod­
ucts, the existing vent pipe is probably oversized for the
single water heater or other appliance. The vent should be
checked for proper draw with the remaining appliance.
1 - In areas where piping penetrates joists or interior
walls, hole must be large enough to allow clearance on
all sides of pipe through center of hole using a hanger.
Page 16
PVC - 5'
24" maximum
3/4" minimum
Wall
outside
FIGURE 22
REPLACING FURNACE THAT
WAS PART OF A COMMON
VENT SYSTEM
WATER
HEATER
OPENINGS
(To Adjacent
FIGURE 23
Room)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents