Preparing To Install The Freezer - GE FP15 Manual

Table of Contents

Advertisement

Available languages

Available languages

Preparing to install the freezer.

Read these instructions completely and carefully.
Freezer Location
Your freezer should be conveniently located for
day-to-day use in a dry, well-ventilated room.
For most efficient operation, it should not be
located where air temperature around the freezer is
ever higher than 110°F. (43°C.) or colder than
32°F. (0°C.)
Clearances
Allow 3 inches (76 mm) on each side and at the top
for proper air circulation and ease of installation.
Turn right
Turn left
to lower
to raise
Handle
Use longest
screw here
Insert
Freezer Door
Adjustable Legs
The two front leveling legs are packed
separately. Screw the two legs into the front
holes on the bottom of the freezer.
How to Attach the Door Handle
Remove the two screws on the front of
1
the door and discard them.
Install the handle on the freezer door as
2
shown.
Be sure to install your freezer on a floor strong
enough to support it when it is fully loaded.
The legs should be set so the freezer is
firmly positioned on the floor, and the front
is raised just enough so the door closes
easily when opened about halfway.
Make sure both screws are tight.
3
Hook the bottom edge of the insert into
4
the bottom of the handle. Bow the insert
slightly and hook the top into place.
9

Advertisement

Table of Contents
loading

Table of Contents