Installing The Cell Assembly; Connecting The Cell Power Cable To The Power Center - Pentair IntelliChlor IC20 Installation And User Manual

Electronic chlorine generator
Hide thumbs Also See for IntelliChlor IC20:
Table of Contents

Advertisement

18

Installing the Cell Assembly

Install the IntelliChlor cell assembly no closer than three (3) feet from the heater outlet, if used. For more
information see plumbing diagrams on page 3 and 4.
Note: After new pool construction has been completed, in order to prevent debris from entering the
IntelliChlor cell assembly, it is recommended that the IntelliChlor pass-through cell (P/N 520588) be
installed before installing the IntelliChlor cell. After the pool system has flushed the debris from the
pipes, remove the pass-through cell and install the IntelliChlor cell.
Note: Pipe couplings: Schedule 80, maximum pressure 75 psi to 70° F
Coupling
To install the cell:
1. Using PCV glue, mount the PVC couplings to the plumbing pipe. Allow the glue to dry.
2. Mount the cell to allow access to the control panel. Install the cell onto the couplings.
Ensure the O-rings are seated properly.
3. Switch on the pump and visually inspect for leaks around the couplings.

Connecting the Cell Power Cable to the Power Center

After the cell installation is completed, connect the power cable to the Power Center:
Align the four pins of the cell power cord connector with the socket on the bottom of the Power
Center and insert the connector. Turn the round socket nut until it locks the connector in place.
IntelliChlor Installation and User's Guide
Coupling
Connector socket nut.
To cell assembly

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents