Commissioning; Switching The Machine On/Off - Pfaff 1295 Instruction Manual

Hide thumbs Also See for 1295:
Table of Contents

Advertisement

Installation and commissioning
8

Commissioning

.03
● Clean the machine thoroughly and afterwards fill it with oil and oil the machine (see
● Check the machine, particularly its electrical wiring and pneumatic tube connections, for
● Have skilled personnel check if the machine can be operated with the available mains
● Connect the machine to the compressed air supply. When it is connected, the gauge
8

Switching the machine on/off

.04
● Switch the machine on (see Chapter 7.01, On/off switch).
8 - 7
Chapter 10, Care and maintenance).
any damage.
voltage.
Do not operate the machine if there is any discrepancy.
Before commissioning the machine, have specialized personnel check whether
the parameter 799 (machine class) is set at "2" and the parameter 800 (sewing
direction) is set at "1". If necessary, have the adjustment carried out (see
Chapter 8.05 Basic position of the machine drive unit).
The machine may only be connected to an earthed socket!
should show a pressure of approx. 6 bar. If necessary, have this reading correctly set
(see Chapter 10.06, Checking/adjusting the air pressure).

Advertisement

Table of Contents
loading

This manual is also suitable for:

1296

Table of Contents