(on the switch side of the rail) and remove each casting. Retain the castings for future rack
requirements. It is not necessary to remove the rear flange castings.
2.
Attach one rail to the front post flange with two user-supplied screws. Refer to item 2 in the
following figure.
3.
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post
flange with two user-supplied screws. Refer to item 3 in the following figure.
4.
Repeat this procedure for the second rail.
Figure 2. Two-Post Flush-Mount Configuration
Two-Post Center-Mount Configuration
To install the Dell ReadyRails system using the two-post center-mount configuration, follow these steps.
1.
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post
flange with two user-supplied screws. Refer to item 1 in the following figure.
2.
Slide the back bracket towards the post and secure it to the post flange with two user-supplied
screws. Refer to item 2 of the following figure.
3.
Repeat this procedure for the second rail.
Install the Hardware
7