Setup The Fluid Manifold For Dynamic Dosing - Graco ProMix 2KS Installation Manual

312775j industrial electronical mixer
Hide thumbs Also See for ProMix 2KS:
Table of Contents

Advertisement

Fluid Supply

Setup the Fluid Manifold for Dynamic Dosing

If you will be operating using dynamic dosing, the fluid
manifold must be setup properly for your application.
Order the 15U955 Injection Kit (accessory).
1. Remove the screws (A) and static mixer bracket
assembly (B). See F
2. Loosen the static mixer nut (N1). Remove and retain
the static mixer (SM).
3. Loosen the u-tube nuts (N2 and N3). Discard the
u-tube (C) and the static mixer fitting (D).
4. Remove and retain the 1/4 npt(m) fitting (F).
Remove the integrator (G) and discard.
N2
D
N1
SM
B
A
F
. 8. Disassemble Integrator and Static Mixer
IG
20
. 8.
IG
C
N3
F
G
TI15004a
5. See F
. 9. Remove the remaining parts from the
IG
restrictor housing (H). Retain the plug (J) and base
(K). Discard all the used o-rings,
6. Rotate the restrictor housing (H) 180° so the set-
screw (S) is at top left, as shown in F
and retain the two setscrews (S). Discard the
o-rings (L3). The position of these screws will be
reversed when reassembled.
7. Install one larger o-ring (L1*) in the housing (H).
Screw the injection cap (M*) into the housing.
8. Determine the desired flow range for your applica-
tion. Select the appropriate size restrictor for your
selected flow and ratio, using the Dynamic Dosing
Restrictor Selection Graphs on pages 36-41 as a
guide. Install the restrictor (R*) in the base (K).
9. Assemble the smaller manifold o-ring (L2*), restric-
tor (R*) and base (K), one larger o-ring (L1*), and
plug (J) as shown.
*
These parts are included in the
15U955 Injection Kit.
H
S
L3*
SM
N1
F
F
. 9. Install 15U955 Injection Kit
IG
. 9. Remove
IG
J
L1*
K
R*
L2*
L1*
M*
TI13360b
312775J

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents