Page 3
89310! PROSYSTEM ASSEMBLY INSTRUCTIONS Attach one (I) I-1/4 SQ. RUBBER BUMPER to the CENTER of the CARRIAGE STOP on the WEIGHT CARRIAGE. Slide WEIGHT CARRIAGE down over the REAR UPRIGHT of the MAIN UPRIGHT. (NOTE: MAKE SURE THAT THE WEIGHT PEG ON THE WEIGHT CARRIAGE IS FACING TOWARDS THE FRONT OF THE MACHINE) LOOSELY attach the two (2) PULLEY MOUNT FLATS to the REAR and FRONT UPRIGHTS of the...
Page 10
893102 PROSYSTEM ASSEMBLY PARTS LIST SORT AND COUNT ALL PARTS BEFORE BEGINNING ASSEMBLY HARDWARE: ITEM NAME/DESCRIPTION 1/2 X 3-1/2 IN. BOLT i/2 X 3-1/4 IN. BOLT 1/2 X 3 IN. BOLT 1/2 X 2-3/4. IN. BOLT 3/8 X 2-3/4 IN. BOLT "...
Page 11
893102 PROSYSTEM ASSEMBLY PARTS SORT AND COUNT ALL PARTS BEFORE BEGINNING ASSF_,I~IBLY WELDMENTS/PARTS: ITEM NAME/DESCRIPTION UPRIGHT FRAME W’ELDJ}IENT TOP BO03"I WELD~IENT CARRIAGE I, VELDMENT 2 SO. X 97-3/8 IN. BENT TUBE ... UPRIGHT WELDMENT LA T BAR WELDYlENT BOOM SUPPORT LEFT ?47ELJD_~IENT BOOM SUPPOR...
Page 12
893102 PROSYSTEM ASSEMBLY INSTRUCTIONS Assemble the appropriate END CAY~S to the UPRIGHT FRAME WELDMENT..BENT TUBE. and the LOW ROWATTACHMENT WELDMENT as shown, also attach STRIPS to the LOWROWATTACHMENT SECURELY assemble LOW ROWATTACHMENT WELDMENT and the ~VELDJ~IENT to the BENT TUBE as shown. LOOSELY assemble the UPRIGHT WELDMENTS to the BENT TUBE as shown.
Page 13
893102 PROSYSTEM ASSEMBLY INSTRUCTIONS LOOSELY assemble the LEFT and RIGHT BOOM SUPPORT WELDMENTS to the WELDMENT as shown. LOOSELY assemble the UPRIGHT WELDMENTS to the LEFT and RIGHT BOOM ’3UPPORT WELDMENTS as shown. SECURELY TIGHTEN ALL LOOSE BOLT CONNECTION MADE TO THIS POINT. Assemble the 4 X 7 IN.
Page 14
893102 PROSYSTEM ASSEMBLY INSTRUCTIONS LOW PULLEY CABLE ROUTING ASSEMBL Y (SEE CABLE ROUTING DIAGRA3~I)." Route CABLE (657620 i) under and around the PULLEYS at the bottom of the UPRIGHT FRAy’vIE WELDMENT. (NOTE: AFTER CABLE HAS BEEN ROUTED UNDER PULLEY, POSITION CABLE RETAINING CLIP UNDER THE PULLEY AS SHOWN AND TIGHTEN) Route CABLE up and around the bottom PULLEY of the 1-3/4 X 5-1/4 IN.