Installation, connecting up, commissioning

3.2 Installing the CP and commissioning

3.2
Installing the CP and commissioning
Prior to installation and commissioning
Read the system manual "S7-1200 Programmable Controller"
Prior to installation, connecting up and commissioning, read the relevant sections in the
system manual "S7-1200 Programmable Controller", refer to the documentation in the
Appendix.
When installing and connecting up, keep to the procedures described in the system manual
"S7-1200 Programmable Controller".
Configuration
One requirement for the commissioning of the CP is the completeness of the STEP 7 project
data (see below). You should also read the section "Configuration and operation (Page 41)".
Inserting the SIM card
Note
Inserting and removing the SIM card
Do not insert or remove the SIM card while the CP is operating.
36
WARNING
Operating Instructions, 01/2015, C79000-G8976-C381-01