GE JGRP20 Installation Instruction page 7

24-inch gas
Hide thumbs Also See for JGRP20:
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
SECURE THE OVEN
IMPORTANT: Remove
all packing material and literature
from the oven before connecting
any electrical supplies,
[]
@
[]
Using a 1/8" drill bit, drill holes through
the
side trim and into the cabinet front.
With the screws provided,
secure the oven
to the wall.
If the cabinet cutout
is 38" high, use the
short trim and attach to the bottom
of the
front frame, with screws provided.
(If the cutout is higher than 38", use the taller trim.)
[_
RECHECK STEPS
Double check to make sure everything
in this
guide has been completed.
Rechecking
steps will
ensure safe use of the oven.
WARNING:
The trim permits air
entry into the cabinet below the unit and
must not be blocked.
7

Advertisement

Table of Contents
loading

Table of Contents