BMW G 650 GS Sertão Rider's Manual page 95

Hide thumbs Also See for G 650 GS Sertão:
Table of Contents

Advertisement

Installing battery
Install battery and attach bleed-
ing hose 4 when doing so.
First install positive cable 3.
Then install negative cable 2.
Slide cover 1 over positive bat-
tery terminal.
Mount the small heat protec-
tion mat 3 with the aluminum
side facing outward and fas-
ten it with the rubber tension-
ing strap 2.
Fold the large heat protection
mat 1 on the battery.
Installing center fairing panel
(
94).
Setting clock (
29).
Checking battery acid
level
Check acid level approximately
every three months.
Remove battery (
92).
Read off acid level from mark-
ing 1.
8
93
z

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G 650 gs

Table of Contents