Table Of Contents; Job Specification Sheet; California Proposition 65 Warning - Pentair FLECK SXT Service Manual

Hide thumbs Also See for FLECK SXT:
Table of Contents

Advertisement

TABLE OF CONTENTS

TABLE OF CONTENTS ..........................................................2
JOB SPECIFICATION SHEET ................................................2
California Proposition 65 Warning .......................................2
TIMER FEATURES ................................................................3
TIMER OPERATION ..............................................................4
MASTER PROGRAMMING MODE CHART ............................5
MASTER PROGRAMMING MODE .........................................6
MASTER PROGRAMMING MODE continued ........................................ 7
MASTER PROGRAMMING MODE continued ........................................ 8
USER PROGRAMMING MODE ..............................................9
DIAGNOSTIC PROGRAMMING MODE ................................ 10
2510/2750/2850S TIMER ASSEMBLY ................................. 11
PLASTIC PADDLE METER ASSEMBLY ............................... 14
1-INCH BRASS PADDLE METER ASSEMBLY .................... 16
1-1/2 INCH BRASS METER ASSEMBLY ............................ 19
CAP ASSEMBLY .................................................................. 21
TROUBLESHOOTING .......................................................... 22
2510SXT WIRING DIAGRAM ............................................... 23
2750SXT/2850SXT WIRING DIAGRAM ................................ 24
SERVICE ASSEMBLIES ...................................................... 26

CALIFORNIA PROPOSITION 65 WARNING

This product contains chemicals known to
WARNING:
the State of California to cause cancer or
birth defects or other reproductive harm.
2 • FLECK
SXT Timer Service Manual

JOB SPECIFICATION SHEET

Job Number: ______________________________________________
Model Number: ____________________________________________
Water Hardness: __________________________________ ppm or gpg
Capacity Per Unit: __________________________________________
Mineral Tank Size: ___________ Diameter: ________Height: ________
Salt Setting per Regeneration: ________________________________
1. Type of Timer:
A. 7 Day or 12 Day
B. Meter Initiated
2. Downflow:
Upflow
3. Meter Size:
A. 3/4-inch Turbine
B. 3/4-inch Paddlewheel
C. 1-inch Turbine
D. 1-inch Paddlewheel
E. 1-1/2 inch Turbine
F. 1-1/2 inch Paddlewheel
G. Generic ______Pulse Count _______ Model ____________
4. System Type:
A. System #4: 1 Tank, 1 Meter, Immediate, or
Delayed Regeneration
B. System #4: Time Clock
C. System #4: Twin Tank
5. Timer Program Settings:
A. Backwash: ______________________________ Minutes
B. Brine and Slow Rinse:_____________________ Minutes
C. Rapid Rinse: ____________________________ Minutes
D. Brine Tank Refill: ________________________ Minutes
E. Pause Time: ____________________________ Minutes
F. Second Backwash: _______________________ Minutes
6. Drain Line Flow Control:
7. Brine Line Flow Controller:
8. Injector Size#:
9. Piston Type:
A. Hard Water Bypass
B. No Hard Water Bypass
Upflow Variable
gpm
gpm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents