Fig.52
Removing the burner
Fig.53
Removing the air/gas unit
Fig.54
Adjusting the gas valve
C
1
A
2
D
7661586 - 2 - 12072016
10.3.6 Burner/combustion chamber door assembly
1. Remove the detection/spark electrode.
See
Section 10.3.1
2. Hinge the control box down.
3. Hinge down the air/gas cover and disconnect all wiring plugs from
the PCB, noting their positions. Close the air/gas cover.
4. Using a 10mm spanner/socket, undo the 4 nuts holding the combus
tion chamber door cover to the heat exchanger.
5. Undo the gas valve nut (30mm A/F).
6. Draw the combustion chamber/burner door assembly with the
air/gas unit away.
7. Remove the two Torx T30 screws holding the combustion chamber/
burner door assembly to the air/gas unit and disengage the tab on
the cover from the air/gas unit.
8. Fit new combustion chamber/burner door assembly to the air/gas
unit and reassemble in reverse order.
PN-0000247
10.3.7 Air/gas unit
1. Disconnect the electrode lead and earthing cable.
2. Hinge the control box down.
3. Hinge down the air/gas cover and disconnect all wiring plugs from
the PCB, noting their positions. Close the air/gas cover.
4. Disconnect the silencer from behind the air/gas unit.
5. Undo the gas valve nut.
6. Remove the two Torx T30 screws securing the air/gas unit to the
burner combustion chamber door assembly.
7. Push the flexible gas pipe downwards and ease the air/gas unit
away from the burner combustion chamber door assembly.
8. Fit the new air/gas unit to the burner combustion chamber door as
sembly and reassemble in reverse order.
Note
Ensure the silencer is correctly positioned.
Setting the gas valve
Note
The CO
PN-0000246
suitable calibrated combustion analyser is available, operated by a
responsible person.
A
Minimum rate (offset) adjustment screw.
B
Maximum rate adjustment screw.
C
Burner gas pressure outlet.
D
Gas supply pressure outlet.
1
Note
B
The case front panel must be fitted when checking combustion.
Run the boiler for several minutes before checking the CO and CO
2
do this it is necessary to operate the boiler in Chimney sweep mode. En
sure the boiler is at Maximum rate.
Insert the test probe in the flue sample point and allow the reading to
stabilise.
See
PN-0000234
Section 7.4.2 Gas Setting (Checking combustion — chimney
sweep mode). If the appliance cannot be operated on central
heating for more than 10 minutes without reaching maximum tem
perature refer to section 14.1.
must only be checked and adjusted to set the valve if a
2
10 Maintenance
. To
2
57