Change The Fuses In The Base Unit - Axis Q8665–LE PTZ Installation Manual

Hide thumbs Also See for Q8665–LE PTZ:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
AXIS Q8665–LE PTZ Network Camera
-
If the fuse is blown, change the fuse. See the table below.
4. Attach the lid on the light sensor box.
N
Incoming ma ins
4 5
1
Fuse holder and fuse
2
Fuse LED
3
Potentiometer P1
4
Mains supply block connector
5
Mains supply cable
6
Pan/tilt unit power supply cable (24 V AC) (pre-mounted)
7
Signal cable (pre-mounted)
Fuse Specification
Voltage
100/120/230 V AC

Change the Fuses in the Base Unit

DANGER
Risk of electric shock. Turn off power supply to equipment prior to working inside base unit.
F1
J1
L
L
N
TR1
6
2
1
F2
L 1
L 2
J2
J3
J4 J5
TR2
TR3
TR4
24~
24~
Fuse
T8A L 250 V
38
3
K 1
P1
J6
status
-
+
7

Advertisement

Table of Contents
loading

Table of Contents