3.5

VENTILATION AND COOLING

Fig. 3.5-1 Installation on plain floor
The heat produced by the UPS is transferred to the environment by its ventilation.
Air inlets for UPS ventilation are located on the front of the UPS, while air outlets are on top of the
cabinet.
A suitable ventilation or cooling system must be installed to extract the heat from the UPS room.
Air filtration systems could be required when the UPS operates in a dirty environment.
Contact your Dealer or the nearest Service Center for appropriate solutions.
In order to prevent overheating of the UPS, the available air intake flow rate must exceed the total air
exhaust flow rate requirement of the UPS system.
The below table indicates the heat dissipation at full load at PF = 0.8 lag. and charged battery, up to
3,280 ft (1,000 m) altitude, for cooling air 77°F (25°C) to 86°F (30°C).
UPS rating
kVA
SG Series 10
SG Series 20
SG Series 30
SG Series 40
Modifications reserved
GE_UPS_OPM_SGS_ISG_10K_40K_0US_V070.docx
Critical Power
NOTE !
Do not put anything on the top of the cabinet.
Losses
BTU / hr
3,036
6,751
8,104
10,808
Fig. 3.5-2 Installation on raised floor
kW
CFM
0.89
135
1.98
301
2.37
361
3.17
482
Cooling air flow
m
/ h
3
230
512
614
819