Setup; Installing The Handle - Toro 22196 Operator's Manual

21 in heavy-duty recycler/rear bagger
Hide thumbs Also See for 22196:
Table of Contents

Advertisement

Setup

Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
Note: Determine the left and right sides of the machine from the normal operating position.
1

Installing the Handle

Parts needed for this procedure:
1
Handle
2
Bolt (5/16 x 1-1/4 inches)
4
Washer
2
Thin nylon insert locknut (5/16 inch)
2
Bolt (5/16 x 1-1/2 inches)
1
Carriage bolt
2
Locknut (5/16 inch)
1
Bag support rod
1
Bag aligning plate
3
Cap locknut
3
Cable tie
Procedure
1. Mount the handle to the outside of the mower
housing (using the bottom hole) with two bolts
Description
Handle
Bolt (5/16 x 1-1/4 inches)
Washer
Thin nylon insert locknut (5/16 inch)
Bolt (5/16 x 1-1/2 inches)
Carriage bolt
Locknut (5/16 inch)
Bag support rod
Bag aligning plate
Cap locknut
Cable tie
No parts required
Discharge tunnel plug
No parts required
Qty.
1
2
4
2
2
1
Install the handle.
2
1
1
3
3
Install the starter rope.
1
Install the discharge tunnel plug.
Fill the crankcase with oil.
(5/16 x 1-1/4 inches), washers, and thin locknuts
(5/16 inch) (Figure 3).
7
Use

Advertisement

Table of Contents
loading

Table of Contents