Setting Equipment - Lennox MERIT ML193UH Installation Instructions Manual

Gas furnace upflow / horizontal air discharge
Hide thumbs Also See for MERIT ML193UH:
Table of Contents

Advertisement

SETTING EQUIPMENT

UPFLOW APPLICATION
UNIT
UNIT
FRONT
FRONT
AIR FLOW
AIR FLOW
1/2"
max.
FRONT VIEW
SIDE VIEW
SIDE VIEW
HORIZONTAL APPLICATION
UNIT
FRONT
AIR FLOW
1/2"
max.
END VIEW
FRONT VIEW
Unit must be level side−to−side. Unit may be positioned from level to 1/2" toward the front to aid in draining.
FIGURE 11
Page 9

Advertisement

Table of Contents
loading

Table of Contents