Unpacking And Installation; Installation Procedure - Kyocera Ri 4530 Copystar Service Manual

Table of Contents

Advertisement

1-3-1 Unpacking and installation

(1) Installation procedure

Removing the securing tape and spacer.
Removing the pins
holding light source units 1 and 2.
Removing the developing unit.
Adding developer.
Installing the drum.
Adjusting the fixing pressure.
Connect the power cord.
Start
Unpack.
Initializing the developer
(run of maintenance mode U130).
Applying toner to the cleaning blade
(run of maintenance mode U160).
Exit maintenance mode.
Setting the cleaning blade.
Adding toner.
Connect the drawer heater relay cable
and attach the OFF label.
Make test copies.
Completion of the machine installation.
2BC/D-1
1-3-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ri 5530 copystar

Table of Contents