1-3-1 Unpacking and installation
(1) Installation procedure
Removing the securing tape and spacer.
Removing the pins
holding light source units 1 and 2.
Removing the developing unit.
Adding developer.
Installing the drum.
Adjusting the fixing pressure.
Connect the power cord.
Start
Unpack.
Initializing the developer
(run of maintenance mode U130).
Applying toner to the cleaning blade
(run of maintenance mode U160).
Exit maintenance mode.
Setting the cleaning blade.
Adding toner.
Connect the drawer heater relay cable
and attach the OFF label.
Make test copies.
Completion of the machine installation.
2BC/D-1
1-3-1