Installation Of Indoor Unit - Carrier 40GJB Owner's Manual

Table of Contents

Advertisement

Installation of indoor unit

Step one: choosing installation location
Step two: install wall-mounting frame
1. Hang the wall-mounting frame on the wall; adjust it in horizontal position with the
plastic expansion particles in the holes.
3. Fix the wall-mounting frame on the wall with tapping screws (ST4.2X25TA) and
Step three: open piping hole
1. Choose the position of piping hole according to the direction of outlet pipe. The
position of piping hole should be a little lower than the wall-mounted frame,
shown as below.
18K:
Wall
Mark in the middle of it
Space
to the
wall
above
6 in (150 mm)
Left
3/4 in (70mm)
Rear piping hole
2. Open a piping hole with the diameter o
hole on the wall slightly
、12K:
Wall
Mark in the middle of it
Space
to the
wall
above
6 in (150 mm)
Left
2 1/6 in (55mm)
Rear piping hole
24K:
Wall
Wall
Level meter
Space
to the
wall
above
6 in (150 mm)
Right
3/4 in (70mm)
Rear piping hole
position. In order to drain smoothly, slant the piping
18
rm it with the client.
Wall
Level meter
Space
to the
wall
above
6 in (150 mm)
Right
2 1/6 in (55mm)
Rear piping hole
Mark in the middle of it
Space
to the
wall
above
6 in (150 mm)
Left
3/4 in (70mm)
Rear piping hole
2 1/6 in (55mm)
2 3/4 in (70mm)
.
Wall
Level meter
Space
to the
wall
above
6 in (150 mm)
Right
3/4 in (70mm)
Rear piping hole

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents