12
SERVICE WORK ON THE CHASSIS
12.10
Removing the lower triple clamp
(EXC Six Days)
–
Open the cable holder in front of the right radiator and detach the wiring har-
ness.
–
Remove screws
–
Remove screw
handlebar and set it aside.
S00830-10
–
Remove O-ring
–
Take off the lower triple clamp with the steering stem.
–
Remove the upper steering head bearing.
M01017-10
(XC‑W)
Preparatory work
–
Remove the headlight mask with the headlight. (
–
Raise the motorcycle with the lift stand. (
–
Remove the front wheel.
–
Remove the fork legs.
–
Remove the front fender. (
–
Remove the handlebar cushion.
Main work
–
Open the cable holder in front of the right radiator and detach the wiring harness.
–
Remove screws
–
Release screw
handlebar and set it aside.
Info
Protect the components against damage by covering them.
Do not bend the cables and lines.
M00989-10
–
Remove O-ring
–
Take off the lower triple clamp with the steering stem.
–
Remove the upper steering head bearing.
M00990-10
and hang the voltage regulator to the side.
. Remove screw
Info
Cover the components to protect them against damage.
Do not kink the cables and lines.
. Remove protective ring
(
p. 88)
(
p. 51)
p. 62)
and hang the voltage regulator to one side.
and remove screw
. Remove protective ring
. Take off the upper triple clamp with the
.
p. 96)
p. 50)
. Take off the upper triple clamp with the
.
55