6 Start-up / Shut-down
6.1
Start-up
ATTENTION
Switch off at the mains.
After connection the electrical wires, close the termi-
nal box. Briefly start the motor (max. 30 sec.) and
check the rotation according to the arrow on the top of
the motor.
If the direction is incorrect change over two of the
power leads.
6.2
Shut-down
All service work must be carried out by qualified
service personnel. Pump must be disconnected from
the power source and all rotating parts must stand
still. Reassure that pump is disconnected from power
source and cannot be switched on. Verify that there
is no voltage at the terminal board!
Open terminal box and disconnect the power leads.
Empty out the pump.
7 Operation
Liquid level
According to the drawing shown below, the maximum
liquid level must stay about 1.18 Inches (30 mm)
below the mounting flange, also ensure that the
minimal liquid level for the TS pump is 1.77 Inches (45
mm) before starting up the motor.
Dimensions in Inches (mm)
If the pump should lock up and cease, shut pump down
(see 6.2) and disconnect from power supply. Pump
must be uninstalled and removed from the system prior
to its repair.
BA6600
8 Servicing and Maintenance
The surface of the motor must be kept free of dirt.
The motor shaft is spinning in permanently greased
ball bearings (with special grease and increased
bearing play) and does not require any special
maintenance.
04/2015
Edition
ATTENTION
Page 6 of 9