Pre-Installation Checklist - HP MSR93X Installation Manual

Hide thumbs Also See for MSR93X:
Table of Contents

Advertisement

Figure 1 Installation accessories
NOTE:
The type of the antenna that comes with the router depends on the router model.

Pre-installation checklist

Item
Installation
site
Requirements
Ventilation
Temperature
0°C to 40°C (32°F to 104°F)
Relative humidity
5% to 90% (noncondensing)
Cleanness
Dust concentration ≤ 3 × 10
ESD prevention
EMI prevention
There is a minimum clearance of 10 cm (3.9 in) around
the router chassis intake and exhaust vents for heat
dissipation.
The installation site ventilation system is adequate.
The equipment and floor are correctly grounded.
The equipment room is dust-controlled.
Humidity and temperature are maintained at
acceptable levels.
Wear an ESD wrist strap when inspecting or handling
a circuit board.
Take measures to protect the power system from the
power grid system.
Keep the protection ground of the router as far away
from the grounding device or lightning protection
grounding device as possible.
Keep the router far away from radio transmitters, radar,
and high-frequency or high-voltage devices.
Use electromagnetic shielding when necessary.
4
4
particles/m
3
Yes No