Download Print this page

Nordyne AireCare 707831C Installation Instructions page 3

Electronic air filter for furnaces

Advertisement

E2 AireCare
TM
Electronic
Air Filter
Installation
Instructions
(5 Ton A/C)
Before starting this installation, make sure that
all electrical
power to the furnace
has been
disconnected.
The 5 Ton E2 AireCare
TM
ElectronicAir
Filter kit
consists of a through the wall grille and frame kit
and the electronic air filter with power cable.
Install Frame
1.
Cut a rough-in opening (20" wide by 30"
high) in the door or wall enclosing the E2
furnace.
2.
Mount the frame kit into the opening using
screw or wall board anchors.
Connect
the AireCare
TM
Electronic
Air Filter
1.
Connectthe
electronicairfilterpowerwires
(24 VAC) to the red and gray (or black) low
voltage terminals (R and C). Run this wire
from the E2 furnace to the electronic
air
filter and frame. Connect
the power wire
marked with a white stripe or dash to C, the
other to R.
2.
Place the electronic air filter into the frame
and connect the filter power cable by plug-
ging it into the connector located at the top
of the electronic air filter.
3.
Turn
on power
to the furnace.
The
AireCare
TM
Electronic Air Filter is active if
the light on top of the electronic air filter is
lit.
4.
Coverelectronicairfilterwith
supplied grille.
E2 Grille
Electronic
Air Filter
Filter
Frame
E2 Frame
Figure 1. E2 Bracket
installation

Advertisement

loading

This manual is also suitable for:

M1 seriesE2 series