Three-Point Linkage - Ford 2000 Operation Manual

Hide thumbs Also See for 2000:
Table of Contents

Advertisement

ATTACHMENT
OF
IMPLEMENTS
SECTION D
THREE-POINT LINKAGE
LINKAGE CATEGORIES
Ford
tractors are
supplied with the following linkage categories:
Ford
2000
and 3000
Category
1
Ford
4000
and
5000
Category
2
TOP
LINK
((f)
Figure
Df)
The
lop
link
is
adjusted
by
releasing the
locknut
(a latch
on
the Ford
5000) and
rotating the
sleeve
until
the desired length
is
obtained.
HYDRAULIC
LIFT
ROCKER
((2)
Figure
Df,
and
Figure
D2)
Better
sensitivity
of control
may
be
obtained
by changing
the pivot point
of
the
rocker or the position of
the top
link
on
the rocker
:
Ford
2/3/5000. Use
(1
)
Figure
D2
for
light
draft
operation
(2)
Figure
D2
for
heavy
draft
operation
Ford 4000.
Use
(1
)
Figure
D2
for
heavy
draft
operation
(2)
Figure
D2
for light draft
operation
LEVELLING
BOX
{(3)
Figure
Df}
A
levelling
box
is
provided
on
the
right-hand
lift
rod
to
control the
level of
the
implement. Turn
the
lever
clockwise
to
lengthen
and
anticlockwise
to
shorten
the
rod.
IMPLEMENT ATTACHMENT
When
connecting
linkage
mounted
implements
attach the left-hand
lower
link
first,
then the right-hand
link
(which can be
raised or
lowered using
the
levelling
box),
and
finally
the
top
link.
This operation
is
much
easier
if
the
tractor
is
correctly
aligned with the
implement.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

300040005000

Table of Contents