Putting The Receiver Into Operation; Preparing The Receiver For Use - Sennheiser EM 100 G3 Manual

Evolution wireless g3 stationary receiver
Hide thumbs Also See for EM 100 G3:
Table of Contents

Advertisement

Putting the receiver into operation

Fastening the
stacking elements
Fitting the device feet
8
Putting the receiver into operation

Preparing the receiver for use

Setting up the receiver on a flat surface
Place the receiver on a flat, horizontal surface. Please note that the device feet can leave
stains on delicate surfaces.
The stacking elements are designed to help protect the operating elements from
damage or deformation, e.g. if the receiver is dropped. Therefore, fasten the sta-
cking elements, even if you do not want to stack your receivers.
To fasten the stacking elements
Unscrew and remove the two recessed head screws (M4x8) on each side of the receiver
(see diagram).
Secure the stacking elements
recessed head screws (see diagram).
The device feet are fitted to the base of the receiver (see diagram).
If you want to stack receivers (see following section), only fit the device feet to the
base of the lowermost receiver.
Do not fit the device feet when mounting the receiver into a 19" rack.
Clean the base of the receiver where you want to fix the device feet.
Fix the device feet to the base of the receiver by peeling off the backing paper and fitting
them as shown on the left.
:
to the sides of the receiver using the previously removed

Advertisement

Table of Contents
loading

Table of Contents