Bryant 352mav Installation, Start-Up, And Operating Instructions Manual page 24

2-stage direct vent condensing gas furnace
Table of Contents

Advertisement

SETUP SWITCHES
LOW-HEAT ONLY AND
BLOWER OFF-DELAY
24-V-THERMOSTAT
TERMINALS
HUMIDIFIER TERMINAL
(24-VAC 0.5 AMP MAX.)
3-AMP FUSE
LED OPERATION &
DIAGNOSTIC LIGHT
115-VAC (L2) NEUTRAL
CONNECTIONS
HI HEAT
LO HEAT
BLOWER SPEED
SELECTION TERMINALS
TABLE 5—APPROVED COMBUSTION-AIR AND VENT PIPE, FITTING AND CEMENT MATERIALS
ASTM SPECIFICATION
MATERIAL PIPE FITTINGS SOLVENT CEMENT AND PRIMERS
(MARKED ON MATERIAL)
D1527
D1785
D2235
D2241
D2466
D2468
D2564
D2661
D2665
F438
F441
F442
F493
For CPVC
F628
F656
F891
TWINNING AND/OR
COMPONENT TEST
LHT
OFF
DLY
TEST/TWIN
HUM
0.5-AMP024 VAC
FUSE 3-AMP
SEC-1
SEC-2
EAC-2
NEUTRAL-L2
BLW
BHI/LOR
BHT/CLR
COOL
1-AMP@115 VAC
SPARE-1
SPARE-2
EAC-1
SPARE-1
COOL
SPARE-2
EAC-1 TERMINAL
(115-VAC 1.0 AMP MAX.)
Fig. 32—2–Stage Furnace Control
ABS
Pipe
PVC
Pipe
For ABS
PVC
Pipe
PVC
Fittings
ABS
Fittings
For PVC
ABS
Pipe
Fittings
PVC
Pipe
Fittings
CPVC
Fittings
CPVC
Pipe
CPVC
Pipe
ABS
Pipe
For PVC
PVC
Pipe
TERMINAL
ACRDJ - AIR CONDITIONING
RELAY DISABLE JUMPER
BLWR
PR-1
HSI
HI LO
115-VAC (L1) LINE
VOLTAGE CONNECTION
Solvent
Cement
Solvent
Cement
Solvent
Cement
Primer
—24—
TRANSFORMER 24-VAC
CONNECTIONS
PL1 - LOW VOLTAGE MAIN
HARNESS CONNECTOR
PL3 -ICM CONTROL
HARNESS CONNECTOR
PL2 - HOT SURFACE
IGNITER & INDUCER
MOTOR CONNECTOR
DESCRIPTION
Schedule-40
Schedule-40
For ABS
SDR-21 & SDR-26
Schedule-40
Schedule-40
For PVC
DWV at Schedule-40 IPS sizes
DWV
Schedule-40
Schedule-40
SDR
For CPVC
Cellular Core DWV at Schedule-40 IPS sizes
For PVC
Cellular Core Schedule-40 & DWV
A02017

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents