Step 5. Are All Of The Features Installed - IBM pSeries 650 Installation Manual

Hide thumbs Also See for pSeries 650:
Table of Contents

Advertisement

2. Press the safety latches on the slide rails, and slide the server about halfway into the rack enclosure.
Note: When the server is fully extended, safety latches on the slide rails lock into place. This action
prevents the server from being accidentally pulled out too far. To release the safety latches,
press the latches from inside the rack.
3. Slide the server fully into the rack enclosure until the slide latches on the front chassis brackets click
into place.
Note: To release the server, release the left and right slide latches, and pull the server forward.
1
4. (Optional) For additional security, such as would be needed when transporting the rack, fasten the
server to the rack enclosure by inserting an M5 screw through the chassis bracket, mounting rail, and
cage nut on each side. Also, a thumbscrew can be used with the hold-down brackets on the rear of the
rack to secure the rear of the server.

Step 5. Are All of the Features Installed?

The 7311 Model D10 I/O Subsystem is a 19-inch rack-mountable expansion drawer that is designed to be
attached to the pSeries 650 system drawer. Two 7311 Model D10 drawers can fit side by side in a single
4U rack enclosure. If you are installing these I/O drawers, refer to the D10 Installation Guide, order
number SA23-1295, for more information.
The 7311 Model D20 I/O Subsystem is a 19-inch rack-mountable expansion drawer that also can be
attached to the pSeries 650 system drawer. A single 7311 Model D20 occupies a full 19" 4U rack position.
If you are installing these I/O drawers, refer to the D20 Installation Guide, order number SA23-1296, for
more information.
16
Eserver pSeries 650 Installation Guide
1 Slide Latches
1

Advertisement

Table of Contents
loading

Table of Contents