Starting Up - Brother bas-311hn Instruction Manual

Table of Contents

Advertisement

4. PREPARATION BEFORE SEWING

4-6. Starting up

3068B
30
Before turning on the power, check that the needle bar
2979B
is at the needle up stop position.
Turn the pulley (1) in the direction of the arrow until the
ridge at the bottom of the thread take-up (2) is aligned with
the index mark.
Aligned
Turn on the power.
If a program has been registered, the program number and
a preview of the sewing pattern will be displayed.
No programs are registered at the time of shipment from the
factory, and so "---" is displayed as the program number
(No.).
For details on the sewing data reading method, refer to "3.
USING STORAGE MEDIA" in the "LCD Panel/Operation
Panel" Instruction Manual.
BAS-311HN, BAS-326H

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bas326h

Table of Contents