Start-Up Check Sheets - International comfort products C9MVX Installation Instructions Manual

90+ two-stage & two-stage, variable category iv, gas furnace
Table of Contents

Advertisement

Date of Start−Up:
Dealer Name:
Address:
City, State(Province), Zip or Postal Code:
Phone:
Owner Name:
Address:
City, State(Province), Zip or Postal Code:
Model Number:
Serial Number:
Setup Checks
Check the box when task is complete.
All Electrical Connections Tight?
Have hoses been relocated for furnace U/D/H
application?
Condensate Drain Connected?
Condensate Drain Trapped?
Manual Gas Shut−off Upstream of Furnace/Drip Leg
Gas Valve turned ON?
Type of Gas:
Natural:
Filter Type and Size:
Shade in Heating Fan "Time OFF" Setting and Thermostat
Type setting:
440 01 2024 04
START−UP CHECK SHEET
For PSC Models *9MPT
(This sheet is optional. Keep for future reference.)
Propane:
Specifications are subject to change without notice.
Calculated Input (BTU) Rate: (See Checks
Adjustments Section).
Heating Check
Measured Line Pressure During High Heat:
Measured Manifold Pressure:
Temperature of Supply Air:
Temperature of Return Air:
Temperature Rise (Supply − Return): High Heat
In Rise Range (see furnace rating plate)?
Static Pressure (Ducts) High Heat:
The Blower Speed Tap used for:
Optional Check:
Cooling Check
Temperature of Supply Air:
Temperature of Return Air:
Temperature Difference:
Static Pressure (Ducts) Cooling:
The Blower Speed Tap used for:
Dealer Comments:
and
High Heat
Low Heat
High Heat
Low Heat
Low Heat
Supply
Return
High Heat
Low Heat
CO?
CO2?
Supply
Return
Cooling
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

H9mpvC9mpvT9mpvC9mptH9mptT9mpt ... Show all

Table of Contents