5.0 Hardware Installation and Wiring
5.1 Mounting the Centurion Controller
The Centurion can be mounted vertically or horizontally on a standard DIN rail. Three clamp type feet along the bottom of
the controller attach to the DIN rail, however, rail stops are recommended to prevent sliding.
MOUNTING
BRACKET DETAIL
C3-1 Mounting
Bracket
DIN Type
C3-1
Mounting Rail
To Panel
5.2 Mounting the Centurion C3-3 Display
The Centurion C3-3 Display can be mounted in the same hole cutout of other Murphy display modules. Four screws
attached the display bezel to the mounting surface.
6-1/2 in. (165 mm)
5.3 Power Supply Wiring
Power
Centurion C3-1 I/O Module
Requirements: (10 to 32) VDC: 30W (Max)
There are two screw terminal connectors for power hookup at
terminals 62 and 63, labeled B+ and B- respectively.
Centurion C3-2 Optional Expansion Module
Requirements: (10 to 32) VDC
There are three screw terminal connectors for power hookup
at terminals 134 to 136, labeled B+, B- and B- respectively.
2-1/2 in.
(64 mm)
2-1/8 in. (54 mm)
6-1/2 in.
(165 mm)
5-1/4 in.
(134 mm)
TTD-98055N page 11 of 44
13-1/8 in. (333 mm)
6.0 in. (152 mm)
3 in. (76 mm)
0.156 in. (4 mm) dia. 4 places
Power Hook Up
C3-1
Power Hook Up
C3-2
5.50 in.
(140 mm)