Dimensional Drawing & Centre Of Gravity; Dimensional Drawing - Panasonic S-UM4JPQ Technical Data Manual

Air conditioning systems
Table of Contents

Advertisement

5
Dimensional drawing & centre of gravity

5 - 1 Dimensional drawing

S-20,12,32,40,50,63UM4JPQ
5
950
Piping side
Drain side
View A
55
840
340
Hanging bolt
4 x M8-M10
NOTES
1
Location of the nameplates:
- Unit body: on the control box cover.
- Decoration panel: on the panel frame at the motor side
under the corner cover
2
When installing an optional accessory, refer to the installation drawings
- For the fresh air intake kit ... an inspection port is necessary
S-80,100UM4JPQ
950
Piping side
Drain side
View A
55
340
Hanging bolt
4 x M8-M10
NOTES
1
Location of the nameplates:
- Unit body: on the control box cover.
- Decoration panel: on the panel frame at the motor side
under the cover corner
2
When installing an optional accessory, refer to the installation drawing
- For the fresh air intake kit ... an inspection port is necessary
11
• Indoor Units • FREE AIR CASSETTE • S-UM4JPQ
860 - 910 (Ceiling opening)
300 or less
710 (Suspension position)
420
See note 3
420
55
55
35
280
330
See note 4
1
2
3
4
5
6
860 - 910 (Ceiling opening)
300 or less
See note 3
840
55
55
35
280
330
See note 4
3
4
5
6
• VRF Systems • Indoor Units
See note 4
840
55
35
See note 4
(*) In case a discharge opening is closed with the 'sealing member' option, the distance of 1500 mm can be reduced to 500 mm on the closed side.
In case of using an Infrared remote control, this position will be a signal receiver.
Refer to the drawing of the infrared remote control for more detail
Make sure the spacing between the ceiling and the cassette is no more than 35 mm. Max ceiling opening: 910 mm.
When the conditions exceed 30°C and RH 80% in the ceiling or fresh air is inducted into the ceiling, an additional
insulation is required (polyethylene foam, thickness 10 mm or more.)
Please respect the distances as shown on figure above.
See note 4
710 (Suspension position)
420
420
840
55
35
See note 4
(*) In case a discharge opening is closed with the 'sealing member' option, the distance of 1500 mm can be reduced to 500 mm on the closed side.
In case of using an Infrared remote control, this position will be a signal receiver.
Refer to the drawing of the infrared remote control for more detail
Make sure the spacing between the ceiling and the cassette is no more than 35 mm. Max ceiling opening: 910 mm.
When the conditions exceed 30°C and RH 80% in the ceiling or fresh air is inducted into the ceiling, an additional
insulation is required (polyethylene foam, thickness 10 mm or more.)
Please respect the distances as shown on figure above.
Model
FXFQ20-50
S-20~50UM4JPQ
S-63UM4JPQ
FXFQ63
Nr
Name
1
Liquid pipe connection
ø A flare connection
2
Gas pipe connection
ø B flare connection
3
Drain pipe connection
VP25 (O.D. ø32, I.D. ø25)
4
Power supply connection
5
Transmission wiring connection
M5 (Inside control box)
6
Air discharge opening
Note 1
7
Corner decoration cover
8
Drain house
O.D. ø32 I.D. ø26
Other unit
Ventilator
External
surface light
1500 mm or more
2000 mm or more
4000 mm or more
1500 mm
or more (*)
200 mm
or more
1500 mm
or more (*)
1500 mm
or more (*)
200 mm
or more
1500 mm
or more (*)
Nr
Name
1
Liquid pipe connection
ø 9.52 flare connection
2
Gas pipe connection
ø 15.90 flare connection
3
Drain pipe connection
VP25 (O.D. ø32, I.D. ø25)
4
Power supply connection
5
Transmission wiring connection
6
Air discharge opening
7
Air suction grill
8
Corner decoration cover
9
Drain house
O.D. ø32 I.D. ø26
Ventilator
External surface
light
1500 or more
2000 or more
4000 or more
1500 mm
or more (*)
200 mm
or more
1500 mm
or more (*)
200 mm
or more
1500 mm
or more (*)
A
B
6.35
12.7
9.52
159
Description
3TW2
8834-1A
Description
Other unit
1500 mm
or more (*)
3TW
8894-1A

Advertisement

Table of Contents
loading

Table of Contents