C Pre-Installation Requirements - Munchkin 399M Installing, Operating & Maintaining

High efficiency commercial boiler
Hide thumbs Also See for 399M:
Table of Contents

Advertisement

DIMENSIONS
Figure 1-2
C. PRE-INSTALLATION REQUIREMENTS
The Munchkin is designed for installation on non-rated flooring, in alcoves, basements, utility rooms,
and closet but never a bedroom closet. Choose a location for your Munchkin, centralized to the piping
system, along with consideration for Electrical (Part 2, Page 6), Gas Connection (Part 3, Page 8) and
Venting (Part 4, Page 11).
GENERAL INFORMATION
5

Advertisement

Table of Contents
loading

Table of Contents