106
BDL4675XU LCD
10.1
System flow chart
10.2
Specification input and update
The product specification shall be initiated by MMD and supported by concerned engineering
department such as E/M/S, Safety/Approbation Group and DQE before RFQ. It must be
updated in each product creation milestone. DQE engineers will be responsible to make product
quality and reliability definition based on the product characteristics and requirements.
10.3
Design quality evaluation capability qualification
During the product creating process, the DQE has to support to regulate the supplier design
quality and reliability evaluation capability to ensure the supplier is qualified to create the best
quality and reliability product to provide to MMD.
10.4
Quality and reliability deliverables list
During product creation RFQ milestone the DQE has to provide deliverables list to supplier and
discuss with them to perform quality and reliability evaluation and testing report per request in
list to DQE for design quality and reliability review and validation.
General Product Specification