Vertical Installation; Horizontal Air Terminal Installation - Model Gds28 - Napoleon GDS28N Installation And Operating Instructions Manual

Ng and propane
Table of Contents

Advertisement

Available languages

Available languages

22

4.2.2 VERTICAL INSTALLATION

This application occurs when venting through a roof. Installation kits for
various roof pitches are available from your authorized dealer / distributor. See
EN
accessories to order specifi c kits required.
A. Determine the air terminal location, cut and frame a square opening as
illustrated in the ceiling and the roof to provide the minimum 1" (25mm)
clearance between the vent pipe and any combustible material. Try to center
the vent pipe location midway between two joists to prevent having to cut
them. Use a plumb bob to line up the center of the openings. A vent pipe
shield will prevent any materials such as insulation, from fi lling up the 1"
(25mm) air space around the pipe. Nail headers between the joist for
extra support.
B. Apply a bead of caulking (not supplied) to the framework or to the Wolf
Steel vent pipe shield plate or equivalent (in the case of a fi nished ceiling),
and secure over the opening in the ceiling. A fi restop must be placed on the
bottom of each framed opening in a roof or ceiling that the venting system passes
through. Apply a bead of caulking all around and place a fi restop spacer over
the vent shield to restrict cold air from being drawn into the room or around the
fi replace. Ensure that both spacer and shield maintain the required clearance to
combustibles. Once the vent pipe is installed in its fi nal position, apply sealant between the
pipe and the fi restop assembly.
C. In the attic, slide the vent pipe collar down to cover up the open end of the shield and
tighten. This will prevent any materials, such as insulation, from fi lling up the 1" (25mm) air
space around the pipe.

4.2.3 HORIZONTAL AIR TERMINAL INSTALLATION - MODEL GDS28

Stretch the inner fl ex pipe to the required length
A.
taking into account the additional length needed for
the fi nished wall surface. Apply a heavy bead of the
high temperature sealant W573-0007 Mill Pac (not
supplied) to the inner sleeve of the air terminal. Slip
the vent pipe a minimum of 2" (50.8mm) over the inner
sleeve of the air terminal and secure with 3 #8 screws.
Using the outer rigid pipe, slide over the outer combustion air
B.
sleeve of the air terminal and secure with 3 #8 screws. Seal
using high temperature sealant W573-0002 (not supplied).
Insert the vent pipes through the fi restop maintaining the required clearance to combustibles. Holding the air
C.
terminal (lettering in an upright, readable position), secure to the exterior wall and make weather tight by sealing
with caulking (not supplied).
From inside the house, using silicone, seal between the vent
D.
pipe and the fi restop. Then slide the black trim collar over the
vent pipe up to the fi restop.
If more vent pipe needs to be used to reach the appliance,
E.
couple them together as illustrated. The vent system must
be supported approximately every 3 feet (0.9m) for both
vertical and horizontal runs. Use noncombustible strapping
to maintain the minimum clearance to combustibles.
The air terminal mounting plate may be recessed into the exterior wall or siding no greater than the depth of its
return fl ange.
W415-1426 / 12.23.14
VENT PIPE
21.1
#10x2"
SCREWS
CAULKING
2" (50.8mm) OVERLAP
HIGH TEMP
SEALANT
#8 X 1/2"SELF DRILLING
SCREWS & WASHERS
HI-TEMP
SEALANT
OUTER
RIGID PIPE
23.7C
9" (288.6mm)
FIRESTOP
UNDERSIDE OF
JOIST
CAULKING
SHIELD
VENT
PIPE
COLLAR
VENT
PIPE
SHIELD
7" (177.8mm) RIGID
PIPE
INNER COUPLER
OUTER
RIGID PIPE
INNER
FLEX PIPE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs28nGds28pGs28p

Table of Contents