Download Print this page

Drainage Piping Work - Mitsubishi Electric PUZ-A12NHA Installation Manual

Hide thumbs Also See for PUZ-A12NHA:

Advertisement

Available languages

Available languages

4.
Installing the refrigerant
piping
@
A24, A36 : A+B+C
< 50 m, 165ft
A
S
IB-CI<
8 m, 26 ft
4.7. For twin combination (For A24, A36 only)
Refrigerant
piping
limitation
of length,
height
difference
are shown
in the figure.
(Fig.
4-7)
@ Indoor unit
© Outdoor unit
© Multi distribution
pipe (option)
@ Height difference
(Indoor unit-Outdoor
unit) Max. 30 m, 100 ft
_ Height difference
(Indoor unit-Indoor
unit) Max. 1 m, 3 ft
Fig. 4-7
5. Drainage piping work
Outdoor
unit
drainage
pipe
connection
When
drain
piping
is necessary,
use the drain
socket
or the drain
pan (option).
A12, A18
[
A24-A42
i
Drain socket
PAC-SG61 DS-E
/Drain
pan
PAC-SG63DP-E
!
PAC-SGS4DP-E
6. Electrical work
6.1. Outdoor
unit (Fig. 6-1, Fig. 6-2)
_) Remove
the service panel.
(2_ Wire the cables referring
to the Fig. 6-1 and the Fig. 6-2.
For Power
®
Fig. 6-1
@ Indoor unit
© Outdoor
unit
© Remote
controller
©
Main switch (Breaker)
¢_ Earth
[]
[]
A12,
A18
A24-A42
_
(_) Earth terminal
©
Terminal block
©
Clamp
©
Service
panel
©
Wire the cables so that they do not
contact the center of the service
panel or the gas valve.
Fig. 6-2
7

Hide quick links:

Advertisement

loading