[6-9 Evaluating and Adjusting Refrigerant Charge ]
(2) Example: PUHY-P350YKB-A1
Indoor 1: P125
The total length of liquid pipe of each size is as follows:
ø12.7: A + e = 40 + 10 = 50 m
ø9.52: B + C + D + a + b + d = 10 + 15 + 10 + 10 + 5 + 10 = 60 m
ø6.35: c = 10 = 10 m
A
(3) Sample calculation
Total length of liquid
Additional
refrigerant charge
=
x 0.26 (kg/m)
(kg)
0 (m) x 0.26 (kg/m)
=
= 12.5 (12.45) kg
CAUTION
Charge liquid refrigerant (as opposed to gaseous refrigerant) into the system.
If gaseous refrigerant is charged into the system, the composition of the refrigerant in the cylinder will change and may
result in performance loss.
HWE14040
a: ø9.52
A: ø12.7
40 m
2: P100
B: ø9.52
10 m
b: ø9.52
3: P40
C: ø9.52
15 m
c: ø6.35
4: P32
D: ø9.52
10 m
d: ø9.52
5: P63
e: ø12.7
B
a
b
P125
P100
Total length of liquid
+
x 0.18 (kg/m)
0 (m) x 0.18 (kg/m)
0
+
0
10 m
5 m
10 m
10 m
10 m
C
D
c
P40
Total length of liquid
Total length of liquid
+
+
x 0.11 (kg/m)
x 0.054 (kg/m)
50 (m) x 0.11 (kg/m)
60 (m) x 0.054 (kg/m)
+
50 x 0.11
+
- 134 -
e
d
P32
P63
Total length of liquid
+
x 0.021 (kg/m)
10 (m) x 0.021 (kg/m)
60 x 0.054
+
10 x 0.021
+ 0
+ 3.5
+ 0
+ 3.5