Install Dryer And Heat Pump - Miele PT 8257 WP Operating And Installation Instructions

Table of Contents

Advertisement

Installation

Install dryer and heat pump

Remove dryer cover.
Rout the connection line through the heat pump and
connect to dryer (see electrical connection).
Insert the heat pump-dryer connection line, plug into
the socket on the dryer.
The dryer is placed in front of the air openings of the
heat pump. Using the adjustable feet, level the dryer
and heat pump and align them parallel to one
another .
30
Tilt the heat pump slightly so that the bottom lug fits
over the bottom profile edge on the dryer. Return the
heat pump to level position so that it is not possible to
shift the dryer forward.
The clamping lug of the heat pump must clamp
beneath the dryer cover. Screw on dryer cover.
Ensure that there is no air leakage between the dryer
and heat pump.