Clearances - Potterton Performa 9 SL HE User's Manual And Important Warranty Information

Condensing central heating boiler
Hide thumbs Also See for Performa 9 SL HE:
Table of Contents

Advertisement

5mm Min
Fig. 1
610mm
For Servicing
Purposes
15mm
In Operation
Fig. 2
6
© Baxi Heating UK Ltd 2008
400mm
5mm Min
260mm

3.0 Clearances

3.1
1. This appliance must have been installed in accordance
with the manufacturer's instructions and the regulations
in force.
125mm
2. Any modification that may interfere with the normal
operation of the appliance without express written
permission from the manufacturer or his agent could
invalidate the appliance warranty. In GB this could also
infringe the Gas Safety (Installation and Use) Regulations.
GB - Heating Industry definition meaning England, Scotland,
Wales, Northern Ireland, Isle of Man and the Channel Isles
595mm
3. Your boiler must not be operated without the casing
correctly fitted.
4. Do not interfere with any sealed components on this
boiler.
5. Take note of any warning labels on your boiler.
6. Your boiler should have the following minimum
clearances for Safety and Maintenance
130mm
(Figs. 1 & 2):-
Top
Bottom
Left side
Right Side
Front
7. If your boiler is installed in a compartment, do not use
it for storage purposes. Do not obstruct any purpose
provided ventilation openings.
8. Flammable materials must not be stored in close
proximity to your boiler.
At Least 1.5°
9. Avoid skin contact when your boiler is in operation, as
some surfaces may get hot e.g. pipework.
10. Ensure that the flue terminal, outside the house,
does not become damaged or obstructed, particularly
by foliage.
11. It is important that the condensate drain system is
not blocked, modified or damaged in any way as this
would affect the operation of your boiler. Your installer
should have insulated any exposed pipework.
For your Safety
- 125mm
- 130mm
- 5mm
- 5mm
- 15mm (In Operation)
- 610mm (For Servicing)

Advertisement

Table of Contents
loading

Table of Contents