quirements and piping requirements are fulfilled, install
piping as follows:
A. In accordance with the above piping requirements,
assemble piping, sediment trap, shutoff valve, and
necessary fittings. Tighten all components securely.
WARNING: Failure to ensure that male threads on
pipe to be installed into gas valve meet the require-
ments of Figure 6 may cause gas valve damage,
distortion and malfunction.
B. Install a threaded nipple, prepared in accordance
with paragraph 3.2 into gas valve.
C. Connect gas piping to nipple installed in the gas
valve.
SUPPLY
LINE
SHUTOFF
VALVE
1/2"
TEE
3"
CAP
Model # MH25NG/LP
RIGID PIPE WITH
UNION OR A FLEXIBLE CON-
NECTOR TO HEATER
NIPPLE
Figure 7. Typical Piping Installation
HS25NG/LP
WARNING: When testing gas piping use only a
soap and water solution. Do not use a match or
other flame for leak testing. If during leakage check
gas is smelled, turn off the gas supply and ventilate
building.
D. Ensure the building is properly ventilated. Without
lighting the pilot light of the heater, open the gas
supply valve and pressurize the piping up to the
heater's gas valve.
E. Using a brush, apply a soap and water solution to
all connections and look for bubbles indicating a
leak. If a leak is detected, turn off gas supply and
tighten connections. Retest and tighten connections
NOTE:
1. ONLY USE A PIPE COMPOUND
2. FITTINGS SHOWN ARE NOT
Installation instructions and Owner's Manual
E9
WHICH IS RESISTANT TO
LIQUIFIED GASES ON LP
INSTALLATIONS.
INCLUDED WITH HEATER.
HEATER

Advertisement

loading

This manual is also suitable for:

Mh25ng/lpMh25Mh25ngMh25lpHs25ngHs25lp