Toshiba Strata DK24 Installation And Maintenance Manual page 123

Hide thumbs Also See for Strata DK24:
Table of Contents

Advertisement

CONTROL/INDICATOR/
CONNECTOR (Figure 6-4)
Off-hook Call
Announce P10
Off-hook Call
Announce P20
Off-hook Call
Announce P40
Off-hook Call
Announce P50
Off-hook Call
Announce P60
DSS/EKT HDSS Console/
Electronic Telephone
SW1 Switch
Door Phone W9 Jumper
Wire
BGM source connection
W5 Jumper Wire
Internal Options
Off-hook Call Announce Unit (EOCU)
External Options
HDSS Console
Door Phone/Lock Control Unit (HDCB)
BGM Source Connection
NOTE:
Refer to Sections 400-096-207 and 400-096-
208 for installation of telephones (including
the following upgrades: HVSU2 or HVSU/
HVSI for Off-hook Call Announce and HHEU
for headset and/or Loud Ringing Bell inter-
face) and external options, respectively.
TABLE 6-B
PEKU CONTROLS AND INTERFACE CONNECTORS
TYPE OF COMPONENT
10-pin connector
10-pin connector
10-pin connector
10-pin connector
10-pin connector
2-position slide switch
White jumper wire
White jumper wire
6-9
DESCRIPTION
Interface connector for optional Off-hook
Call Announce subassembly
connector (used in conjunction with P20,
P40, P50, and P60).
Interface connector for optional Off-hook
Call Announce subassembly
connector (used in conjunction with P10,
P40, P50, and P60).
Interface connector for optional Off-hook
Call Announce subassembly
connector (used in conjunction with P10,
P20, P50, and P60).
Interface connector for optional Off-hook
Call Announce subassembly
connector (used in conjunction with P10,
P20, P40, and P60).
Interface connector for optional Off-hook
Call Announce subassembly
connector (used in conjunction with P10,
P20, P40, and P50).
Configures PEKU for operation with an
HDSS console or electronic telephones.
When cut, configures PEKU for
installation of an optional HDCB.
When cut, configures PEKU for BGM
source connection.
5.12 Off-hook Call Announce (EOCU) Installa-
tion. Install the Off-hook Call Announce Unit (EOCU)
in accordance with the following steps:
1) Remove the PCB from its protective packag-
ing.
NOTE:
PEKU connectors P10, P20, P40, P50, and
P60 are positioned to allow installation of the
EOCU only in the proper position (Figure 6-5).
2) Mate EOCU connectors J10, J20, J40, J50,
and J60 (Figure 6-6) with PEKU connectors
INSTALLATION-PCB
SECTION 400-096-206
SEPTEMBER 1992

Advertisement

Table of Contents
loading

This manual is also suitable for:

Strata dk96Strata dk56

Table of Contents