PROGRAMMING THE BREWER (cont.)
SET NEW RECIPE
Using a Smart Funnel and a G9-2T DBC or MHG
Grinder:
This function allows the operator to set BREW
VOLUMES, BYPASS PERCENTAGES, PULSE BREW
TIMES and DRIP-OUT TIMES for each coffee name
preset in the grinder's memory.
Certain coffee NAMES are stored in the grinder's
memory. When a particular name of coffee is ground
into the Smart Funnel, that name and the batch size
selected are transferred from the grinder to the pro-
gramming chip located in the funnel handle. The funnel
is then inserted into the brewer's funnel rails. The sen-
sor coil on the brewer reads the information contained
in the handle. The name of the coffee fl avor will then
appear on the display. This allows the operator to set
the BREW VOLUMES, BYPASS PERCENTAGES, PULSE
BREW TIMES and DRIP-OUT TIMES for that particular
coffee NAME. It also allows the operator to set other
brewing parameters, such as BREW TEMPERATURE,
READY TEMPERATURE, BREW LOCKOUTS, etc. Each
coffee NAME can be set individually to provide optimum
brewing quality.
SET NEW RECIPE?
NO
REVIEW RECIPES?
NO
YES
INSERT FUNNEL
WITH NEW NAME
FUNNEL
CONTAINS NAME
(COFFEE NAME)
NO
YES
BEGIN SETUP OF
(COFFEE NAME)
SETUP BREW VOLUMES, BYPASS, PULSE BREW,
PREINFUSION, DRIPOUT TIME
3 BATCHES DONE?
NO
YES
(COFFEE NAME)
SETUP COMPLETE
YES
2 SEC.
CYCLES THROUGH
TWO SCREENS
QUIT SETUP?
YES
FUNNEL DETECTED
FUNNEL CONTAINS
NO NAME
MUST GRIND INTO
FUNNEL FIRST
SEE SEPARATE DIAGRAMS
FOR SETUP INSTRUCTIONS
P2439
Procedure for Setting the Recipe:
NOTE: Before beginning setup, place a server beneath
the brew funnel.
1. Insert the funnel into the grinder and select a batch
size to grind. It is not necessary to have coffee beans
in the hopper(s) in order to program the brewer.
The coffee name is pre-selected and stored in the
grinder's memory for the side being ground.
2. Press the GRIND switch. When the grinder stops
grinding, remove the funnel.
3. On the brewer, press and hold the upper right hid-
den switch until the display reads UNITS. Release
the switch, then press and release the switch again
until the display reads SET NEW RECIPIE.
4. Press and release YES. The display should read
INSERT FUNNEL WITH NEW NAME, then QUIT
SETUP? These three displays will repeatedly
cycle.
5. Insert the funnel into the rails of the brewer. The
display should read the NAME of the coffee that
was ground into the funnel, along with a NO and
YES. If the NAME on the display is correct, press
YES.
6. If, for some reason, the name of the coffee from
the grinder did not load properly into the funnel,
or if a grind has not yet been done, the display will
read MUST GRIND INTO FUNNEL FIRST. It will be
necessary to grind another batch following steps
1 and 2.
7. If the grind is acknowledged by the brewer, the
display will read BEGIN SETUP OF (COFFEE NAME).
Then the screen will display BREW OZ. and a batch
light will be blinking. (Refer to BREW OZ. SETTING
OR ADJUSTING for description).
Page 19
BREW OZ. XX.X
(-)
DONE
(+)
3 BATCHES DONE?
NO
YES
% BYPASS XX.X
(-)
DONE
(+)
P2415
35879.1 071405