Dimensions - Rinnai RHFE-1004FA Owner's Operation And Installation Manual

Hide thumbs Also See for RHFE-1004FA:
Table of Contents

Advertisement

inches (mm)
10 7/8"
(R277)
6 5/16"(160)

DIMENSIONS

14 1/16" (357.5)
36 5/8" (930)
28 7/16" (723)
11 13/16" (300)
13 3/4" (R350)
Cavity Opening
FLUE MANIFOLD POSITION
Center of hole for flue manifold can be drilled
anywhere within the shaded area. (To avoid
studs, etc.)
FOR WEATHERBOARD WALLS DRILL
THROUGH CENTER OF WEATHER BOARD
FROM OUTSIDE, THEN DRILL FROM
INSIDE THROUGH PLASTERBOARD.
Flue Hole
Before drilling the flue hole, check for water
and gas pipes as well as electric cables. Use
a 3 1/8" (80mm) drill for hole through wall.
GAS  CONNECTION
– 5 –
12 7/16" (316)
7 7/8" (200) 4 9/16" (116)
13" (330)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents